---
title: Extricating Membership as a PRP at Hazardous Waste Disposal Sites
description: Various methods which companies named as a potentially responsible party (PRP) for hazardous waste site can either extricate themselves or minimize their liability
image: https://info.rouxinc.com/hs-fs/hub/155000/file-1351179198.jpg
---

[![ROUX](https://info.rouxinc.com/hs-fs/file-1113344656-png/images/logo.png "ROUX")](http://www.rouxinc.com/)

![header-text](https://info.rouxinc.com/hs-fs/file-1113344661-png/images/header-text.png)

# Roux Blog

## [Extricating Membership as a PRP at Hazardous Waste Disposal Sites](https://info.rouxinc.com/blog/extricating-membership-as-a-prp-at-hazardous-waste-disposal-sites)

Posted  on Aug 1, 2014 2:04:46 PM

- [Tweet](https://twitter.com/share)

![ALL_Roux-Banner](https://info.rouxinc.com/hs-fs/hub/155000/file-1351179198.jpg?width=570&name=file-1351179198.jpg)

### **Extricating Membership as a PRP at Hazardous Waste Disposal Sites**

A paper titled “Extricating Membership as a PRP at Hazardous Waste Disposal Sites,” authored by [Neil M. Ram](http://t.hsms05.com/e1t/c/*W8NnlmK9jS79-W1YTx276mJ-7J0/*W1B-d6m2bhz0HW8Sxhkr6BJGD00/5/f18dQhb0Sjvj8YHsrKW7g__X72qwv27W3DLlLX2slCd_Mf5v0xXD6prW39Dr-N8pCDKfW96zMzp4sh-53W96Ls816bF5NjW6PsCx16PsvTyN1xkW_BcjtspW6PstC11nrCGBW51LTg55DHNj2W25FVD78xPnDGW96dB5q8Sg7PvW5ZpycS57-ZBTW83C5JP6rY-3sW2KQ2YY1GrMRXW37Zf1f1ks0KjW392Fmt5jPVDHW47P0wC403tVSW3vbpkw6n904zW38c-Bh2WT-g4W2-vfmP3gWQ1LW47WD-P4ydKJQW3C9s-m3yZy32W47Rz7-6x3CNdW6VQ51r3B-bN0W3SPPbX6v56NkW2wC1GD5zN4jrW48kDZm5FytghW60gSbT2YnLd1W5RgDpG2TQZmpW1jCFWn2PGKtHLkWYGcZLWRW86l3lK5kdfN2W8hGVK411jmt-VwF43r4r5l5jW3bJVZ69jF1zQW9ksXvX9fBPMTW89KdBj99CQTtW4Y3ysm9dRfBFW3th5Mb2x86cq0), Wai Kwan, Chase A. Gerbig, and Catherine Moore, of Roux Associates, Inc., was published in the Spring 2014 issue of *Remediation: The Journal of Environmental Cleanup Costs, Technologies & Techniques.  *The paper describes various methods by which companies named as a potentially responsible party (PRP) for a hazardous waste site can either extricate themselves from responsibility for site cleanup or minimize their liability for response action costs.  If companies adopt a proactive approach to potential Superfund liability by carefully documenting and understanding their involvement at a site, they can:

1. Avoid being held responsible for a greater share of response costs than they should reasonably be allocated
2. Appropriately structure funding to anticipate potential future environmental liability
3. More accurately disclose financial information

Determining a PRP's potential liability for the assessment and cleanup of hazardous waste sites is a challenging effort and often results in disputes among other PRPs regarding appropriate allocation of response action costs to each party. The first step in such an evaluation is to determine whether or not a PRP can extricate themselves from any association with the subject site or, alternatively, demonstrate *de minimis* status. Methods for doing so, which are described in this paper, include the following: 

- Evaluating prior settlements or indemnifications with other PRPs 
- Identifying insurance coverage or other financial assurance instruments for the disposal facility
- Examining applicable statutes of limitations against when a PRP received notification from the regulatory agency

The paper also presents a case study discussing how a PRP with a portfolio of 72 hazardous waste disposal sites was able to extricate itself from the majority of these sites, resulting in only four sites where the PRP was determined to be an RP and where an associated allocable share was assigned.  Such information can be used by both private and public companies to provide reasonably estimable costs of their financial exposure associated with hazardous waste sites. 

 

If you would like to order the full article, please click [here](http://t.hsms05.com/e1t/c/*W8NnlmK9jS79-W1YTx276mJ-7J0/*W7N0h805KZpQtW5Mx6jd6bWpFy0/5/f18dQhb0SmhV8YXMXYW7g__X72qwv27W3DLlLX2slCd_Mf5dGYXD6prW39DrXV5C9bk3W5tXHsS8nvGGwW5wTCNB6PVKcrW6N3nBL8xGZLcW5C9f5h50Cw2DW4rzsxb203WCyN2yJF1WYT2jkW6P4lCX3WddQjW6Pkt_V62_rWzW4MW8X34r1Pm7W1nq9rQ18dKPTW1VJryk5lX8fqW13bD4h6dkxD5W6XvNqH7pc0WYW2sC35N1gP8tKW1BMffD6zwmycW3pW2-R1yRHHbW4P3Cfq2MBrsgW7nKhWW5mJCG9W76v2Bw76ptNWW2RG5XD1G9TpJW8W2TX_5KQVmyN2sKB3HwmjDnW1DcqBX78Jq_JW8SwB028nDXSjW38H1t83Cdk0dW3wv7Sm6x-9qDW2JC1w82VvgfwW1vv0bD7lbj90W2NB2Kk3xxDzVVJgwnk4qjlzZW7qZPzQ3BxcQXW8XhnBc9gymvBW3CwjNb6YNtmkVtGhNd8kHGlt102).  Or if you are interested in learning more about the above topic or about Roux Associates' Litigation Support services contact Roux via the button below to request or schedule a technical brown bag tailored to your needs. 

 

[![Request for More Information: Litigation Support Services ](https://no-cache.hubspot.com/cta/default/155000/5a4f4c9b-2ed4-4df7-8ecb-2451297c8915.png)](https://cta-redirect.hubspot.com/cta/redirect/155000/5a4f4c9b-2ed4-4df7-8ecb-2451297c8915)

 Topics: [Litigation Support](https://info.rouxinc.com/blog/topic/litigation-support)

### Subscribe via E-mail

### Latest Posts

### Previous Posts

- [September 2014 (7)](https://info.rouxinc.com/blog/archive/2014/09)
- [May 2013 (4)](https://info.rouxinc.com/blog/archive/2013/05)
- [July 2014 (4)](https://info.rouxinc.com/blog/archive/2014/07)
- [May 2012 (3)](https://info.rouxinc.com/blog/archive/2012/05)
- [November 2012 (3)](https://info.rouxinc.com/blog/archive/2012/11)
- [March 2013 (3)](https://info.rouxinc.com/blog/archive/2013/03)
- [August 2013 (3)](https://info.rouxinc.com/blog/archive/2013/08)
- [May 2014 (3)](https://info.rouxinc.com/blog/archive/2014/05)
- [October 2012 (2)](https://info.rouxinc.com/blog/archive/2012/10)
- [February 2013 (2)](https://info.rouxinc.com/blog/archive/2013/02)
- [November 2013 (2)](https://info.rouxinc.com/blog/archive/2013/11)
- [January 2014 (2)](https://info.rouxinc.com/blog/archive/2014/01)
- [March 2014 (2)](https://info.rouxinc.com/blog/archive/2014/03)
- [April 2014 (2)](https://info.rouxinc.com/blog/archive/2014/04)
- [June 2014 (2)](https://info.rouxinc.com/blog/archive/2014/06)
- [June 2012 (1)](https://info.rouxinc.com/blog/archive/2012/06)
- [August 2012 (1)](https://info.rouxinc.com/blog/archive/2012/08)
- [September 2012 (1)](https://info.rouxinc.com/blog/archive/2012/09)
- [April 2013 (1)](https://info.rouxinc.com/blog/archive/2013/04)
- [June 2013 (1)](https://info.rouxinc.com/blog/archive/2013/06)
- [September 2013 (1)](https://info.rouxinc.com/blog/archive/2013/09)
- [October 2013 (1)](https://info.rouxinc.com/blog/archive/2013/10)
- [December 2013 (1)](https://info.rouxinc.com/blog/archive/2013/12)
- [August 2014 (1)](https://info.rouxinc.com/blog/archive/2014/08)

### Follow Me

<https://info.rouxinc.com/CMS/UI/Modules/BizBlogger/rss.aspx?moduleid=1134725><https://twitter.com/RouxAssociates><https://plus.google.com/115282427156323781573>

Roux Associates Inc. Headquarters, 209 Shafter Street, Islandia, NY 11749 | 1-800-322-ROUX | [sales@rouxinc.com](mailto:sales@rouxinc.com)